By Caroleine James
Wrangell Sentinel 

Borough to negotiate short-term lease for scrap metal recycling at 6-Mile site

 

October 5, 2022



The borough assembly has granted Manager Jeff Good the authority to negotiate a short-term lease with Channel Construction to use a portion of the 6-Mile mill site for a scrap metal recycling operation.

Juneau-based Channel Construction has been running a regional metal recycling operation at the property, which the borough purchased for $2.5 million this summer. Owner William “Shorty” Tonsgard Jr. initially applied for a long-term lease that would allow him to continue operating at the site after the borough took over the land.

The port commission unanimously voted down a motion Sept...



For access to this article please sign in or subscribe.

 

Reader Comments(0)

 
 

Powered by ROAR Online Publication Software from Lions Light Corporation
© Copyright 2024

Rendered 04/05/2024 00:02